Relay Protection Test Sets

VA-TEK builds relay protection test sets in three classes, and which one a project needs is decided by what has to be proven on site: three-phase secondary injection sets such as the VAE-430 for feeders, motors and transformer overcurrent schemes; six-phase sets such as the VAE-660 for transformer, busbar and line differential protection, where every current in the characteristic must be applied at once; and CT/PT analyzers such as the VACTP200P, which verify ratio, polarity, excitation and burden before a relay test is worth starting. Relay protection testing itself is the process of proving that a relay picks up, times and trips as its settings require — the method and step-by-step procedures are set out in our protective relay testing guide. The sections below show how each class of test set supports that work.

New technical whitepaper: Relay Protection Testing — Standards, Test Items and Test-Set Requirements. A 29-page PDF covering the four-layer standards landscape, the test items each protection scheme requires, and what a relay test set must deliver. Download the PDF — free, no registration.

Why relay testing matters

Protective relays sit idle for months or years, then must trip within milliseconds when a fault occurs. Regular testing is the only way to confirm that:

  • Pickup and drop-off thresholds remain within the tolerances assumed by the coordination study
  • Operating times meet the coordination and grading margins across the whole curve, not just at one point
  • Characteristic shape is correct — an inverse-time curve that is right at 2 × setting can be wrong at 10 ×
  • Scheme logic, interlocking and trip circuits behave as designed, end to end
  • CT and VT circuits are wired to the correct ratio and polarity before protection is relied upon

The test record is part of the deliverable. A commissioning file that shows which relay was tested, against which setting, with which result, is what supports energisation and what an asset owner relies on for the next maintenance cycle.

Which instrument for which job

Requirement VAE-430 VAE-660 VACTP200P
Secondary injection, three-phase current and voltage Yes Yes —
Six-phase / multi-end injection for differential and line schemes — Yes —
Distance zone and impedance characteristics Yes Yes —
CT/PT ratio, polarity, excitation, knee point, burden — — Yes
Typical role Distribution feeders, motor and transformer protection, maintenance testing Transmission lines, busbar and transformer differential, end-to-end schemes Commissioning the measurement chain before relay tests

If your scope is maintenance testing of overcurrent and earth-fault relays on a distribution network, a three-phase set is sufficient and easier to carry. If it includes transformer differential, busbar protection or line differential, the six-phase unit is not a convenience — it is a requirement, because a differential characteristic can only be verified with the full current set applied simultaneously. When six phases are actually needed →

Protection functions covered

The test software ships with pre-configured modules for the relay types most often encountered in commissioning and maintenance:

  • Overcurrent and earth fault (50/51, 50N/51N), including IEC and ANSI curve families
  • Differential (87, 87T, 87B, 87L) with bias and harmonic restraint
  • Distance (21) with zone reach, time steps and power swing behaviour
  • Voltage and frequency (27, 59, 81), synchronising (25) and directional (32, 67)
  • Motor protection (49, 46, 48) and generator protection (32, 40, 46, 51V, 64G, 78)
  • Auxiliary functions: breaker failure, trip circuit supervision, autoreclose logic

Where a relay’s characteristic is not covered by a standard module, the manual test interface applies currents and voltages directly, so the test is limited by the instrument output rather than by the software library.

Built for the field

Both test sets run from a standard mains supply, weigh in a transportable package and are built to be carried into a substation by one engineer. Practical points that matter in service:

  • Sufficient output to drive electromechanical and high-burden static relays, not only modern low-burden IEDs
  • Binary inputs and outputs for scheme testing, trip timing and breaker simulation
  • Independent channels, so phase-shifted current sets can be applied without external switching
  • On-board storage of test files and settings, so results survive a laptop failure on site

IEC 61850 and digital substations

As utilities move to digital substations, the test method has to keep pace. VA-TEK relay test sets are analog secondary-injection instruments: they test a relay through its current and voltage inputs, which is the correct method for conventional and hybrid bays and proves the whole measurement chain including wiring. Full process-bus testing — where Sampled Values replace the analog inputs and the test set must publish SV and GOOSE, timestamp events and verify the network — requires a dedicated IEC 61850 test set, which VA-TEK does not currently offer. If a project requires that scope, it should be specified separately; we will not present analog injection as an equivalent substitute.

Read more: IEC 61850 testing and testing in an IEC 61850 substation.

Automated reporting

Test Manager generates reports in PDF and Word with a single click: test parameters, expected versus measured results, pass/fail status, characteristic plots where relevant, and a time-stamped, signed record suitable for audit and for handover dossiers. Report templates can be adapted to a client’s required format and carry the testing company’s identity rather than ours.

Standards and procedures

Test procedures follow IEC 60255 for measuring relays and protection equipment and the relevant IEEE C37 guides, with relay-specific requirements taken from the manufacturer’s manual. Instrument safety and EMC follow IEC 61010-1 and IEC 61326-1. The step-by-step procedures behind the software modules are described in our protective relay testing guide.

Training and support

Every instrument purchase includes commissioning support and operator training, delivered remotely or on site. Our application engineers can review a test file with you before a decision is made on site, which is often faster than resolving an unexpected result by email.

Industry applications

If the test object determines the test plan, start from the application page rather than the instrument page:

When the test object is not a protection relay at all, the programmable V/I source hub covers ATS controllers, generator controls, reactive power and tap changer controls, COMTRADE playback and DC coils.