Technical Insights
In-Depth Knowledge on Relay Protection Testing, High-Voltage Cable Testing, and Transformer Condition Assessment
Our technical library covers the full spectrum of electrical testing for power systems — from protective relay testing and IEC 61850 commissioning to VLF cable testing and transformer electrical diagnostics. Articles are written by application engineers with hands-on expertise in high-voltage test equipment.
How to use this library
Articles are written for engineers who have to make a decision: choose a test voltage, interpret a result, write a procedure, or justify a scope to a client. Each one states the applicable standard, the measurement involved and the practical constraint behind it. If you are new to a topic, start with the guide and follow the links into the detailed articles.
Start here
| If your question is about | Start with |
|---|---|
| Testing a medium-voltage cable | VLF cable testing guide, then selecting the test voltage |
| Choosing a VLF test set | Selection by voltage class and the buyer checklist |
| Commissioning protection relays | Protective relay testing guide and the commissioning checklist |
| Testing instrument transformers | CT/PT excitation and knee point |
| Transformer electrical tests | Transformer electrical testing guide and the commissioning sequence |
| IEC 61850 and digital substations | IEC 61850 testing and the testing guide |
| Calculating a value before testing | Calculators and tools |
Standards we write against
The technical content tracks the standards that govern field testing, principally IEEE 400.2 for VLF testing of shielded cable, IEC 60502-2 for extruded MV cable, IEC 60076 and IEEE C57.152 for transformers, IEEE C57.149 and IEC 60076-18 for SFRA, IEC 60255 and IEEE C37 for protection, IEC 61850 for substation communication, and IEC 61010-1 with IEC 61326-1 for instrument safety and EMC. When a standard is revised, the affected articles are reviewed and the change is noted in the article.
Where our equipment does not cover a requirement — full process-bus testing with Sampled Values, for example — the article says so rather than implying a capability we do not have.
Article Categories
- Relay & Secondary Testing
- Standards & Test Practice
- Transformer Electrical Testing
- VLF & Cable Testing
Latest Articles
- CT Saturation Testing: Knee Point, Excitation Curve and Relay Stability
- Partial Discharge Testing: What It Finds, What It Misses, and What It Cannot
- Tan Delta Testing: What the Number Means, and When It Misleads
- Busbar Protection Charging Test: 87B Stability and CT Circuits
- VLF vs Tan Delta vs Partial Discharge: Which Test Finds Which Fault
- Thermal Overload Relay Testing (49): Cold Curve, Hot Curve and Memory
- Negative Sequence Relay Testing (46): Unbalance, Curves and Motor Protection
- Out-of-Step Protection Testing (78): Trip on an Unstable Swing
- Power Swing Blocking Relay Testing (68): Impedance Locus and Timers
- Zero-Sequence Overcurrent Relay Testing: 51N and 51G Inverse Curves
Subscribe for Technical Updates
Receive notifications of new technical articles, standard revisions, and white paper releases.