What does VA-TEK do?

VA-TEK is the electrical test equipment brand of Shenzhen Feso Automation Technology Co., Ltd. (FESO), a manufacturer based in Shenzhen, China. We design, build and calibrate instruments used to commission and maintain power system equipment — the tools a testing engineer carries into a substation, a cable trench or a transformer bay.

The range covers four families:

  • Relay protection test sets — VAE-660 (six-phase) and VAE-430 (three-phase) for secondary injection and protection scheme testing.
  • Instrument transformer analyzers — VACTP200P for CT/PT ratio, polarity, excitation, knee point and burden.
  • Transformer test instruments — TTR-400 turns ratio, TWO-1100S winding resistance, FRA100 SFRA and TDC-3100 tan δ / capacitance.
  • VLF cable test sets — the VLF 30–90 kV family, including tan δ versions.

Beyond the hardware we supply the software for test execution and reporting, factory calibration certificates, operator training and application support. Because design, assembly and calibration happen in one facility, a specification question or a firmware problem is answered by the team that built the instrument rather than by a third party.

What we do not do is worth stating as plainly: we do not supply IEC 61850 process-bus test sets, and we do not sell dissolved-gas monitoring under this brand. See the full product range or solutions by application.

Are VA-TEK relay test sets compliant with international standards?

Yes, with a distinction worth making between two different kinds of standard. Instrument safety and EMC compliance is separate from the test standards the relay itself was designed to.

Instrument compliance

  • IEC 61010-1 — safety requirements for electrical test and measurement equipment.
  • IEC 61326-1 — EMC requirements, both emission and immunity, for measurement equipment used in industrial environments.
  • CE marking for the European market, with a Declaration of Conformity listing the standards applied.
  • RoHS 3 (EU 2015/863) and REACH declarations for restricted substances.
  • ISO 9001:2015 for the manufacturing facility's quality management system.

The relay standards the tests serve

Test procedures follow IEC 60255 for measuring relays and protection equipment and the relevant IEEE C37 guides; relay-specific acceptance criteria come from the relay manufacturer's manual and from the coordination study. When a customer's specification names a different standard or a national grid code, that takes precedence over our default procedure.

Documents — certificate copies, type test records, declarations — are supplied with a quotation or on request, in the format a tender requires. See Quality certifications for what each document establishes. If a specification cannot be met, that is stated in writing at quotation stage rather than discovered at acceptance.

What relay types can VA-TEK relay test sets test?

VA-TEK relay test sets cover all common protection functions found in transmission, distribution and industrial systems. Pre-configured test modules ship for:

Function ANSI device numbers
Overcurrent and earth fault 50/51, 50N/51N, 67 directional
Differential 87, 87T, 87B, 87L
Distance 21, including zone timing and power swing
Voltage and frequency 27, 59, 81U/81O, 25 sync-check
Motor protection 49 thermal, 46 negative sequence, 48 starting, 50/51
Generator protection 32, 40, 46, 51V, 64G, 78, 81
Transformer protection 87T, REF (64), 63 sudden pressure, 24 overexcitation
Auxiliary Breaker failure (50BF), trip circuit supervision, autoreclose logic

Channel count decides what can be tested in one pass. The VAE-430 (three-phase) covers feeder, motor and single-end transformer protection. The VAE-660 adds the current channels and independent phase shift needed for differential and multi-end schemes — a differential bias characteristic cannot be verified properly with a three-channel set.

Functions outside the module library are tested through the manual interface, which applies currents and voltages directly; the limit becomes the instrument output rather than the software. See relay protection testing for the instrument comparison, or when six phases are actually needed.

How often should protective relays be tested?

There is no single correct interval — it follows from relay criticality, regulatory requirements and the history of the asset. The practical answer for most networks:

Relay / application Typical interval
Critical transmission protection (line, busbar, transformer differential) Every 2–4 years, or at each major outage, whichever comes first
Distribution feeders and industrial protection Every 3–6 years, aligned with breaker maintenance
Generator protection At each major unit outage; after any event that operated the scheme
After a fault, a settings change or a firmware update Always — before the circuit is returned to service
New installation At commissioning, and again at first maintenance cycle

What shortens the interval

  • Regulatory maintenance programmes — for example NERC PRC-005 in North America sets maximum intervals for protection system components; a utility's own policy is usually stricter.
  • Environment — vibration, humidity, corrosive atmosphere and wide temperature swings age both relays and wiring.
  • History — a relay that has operated into a fault, or one whose circuit has been modified, is not on the normal cycle any more.
  • Asset age — electromechanical relays drift mechanically; their settings should be checked more often than a static relay with a stored settings file.

A defensible programme records the interval, the test performed and the result per relay, so that the interval can be justified rather than inherited. The checks that belong in each visit are listed in our protection relay commissioning checklist.

What is protective relay testing and why is it important?

Protective relay testing is the process of proving that a protection relay will operate correctly when a fault occurs — tripping at the right current or voltage, within the right time, in the right sequence with the rest of the scheme. It is done by secondary injection: the test set applies calibrated currents and voltages to the relay terminals and measures how the relay responds, without energising the primary circuit.

What is actually measured

  • Pickup and dropout thresholds — the value at which the element operates and resets, compared with the setting.
  • Operating time across the characteristic — several points on an inverse-time curve, not just one, so grading margins are verified where they are tightest.
  • Characteristic shape — differential bias curves, distance zones, directional boundaries, harmonic restraint.
  • Scheme behaviour — logic, interlocking, breaker failure, autoreclose, and the trip circuit itself.

Why it is done

Relays sit idle for years and must then operate in milliseconds. Settings drift when tap changers move, CT circuits are modified or firmware is updated; wiring errors survive installation because nothing tests them until a fault. Testing is the only evidence that the protection will do what the coordination study assumed.

Procedures follow IEC 60255 and the relevant IEEE C37 guides, with relay-specific detail from the manufacturer's manual. Step-by-step methods are in our protective relay testing guide and secondary injection testing guide; the instruments are described under relay protection testing.

How do I get technical support for my VA-TEK instrument?

Technical support is available by email, phone and remote desktop, Monday to Friday 09:00–18:00 GMT+8. Email info@fesotest.com or call +86 132 6572 6720. Requests are answered by application engineers rather than a general enquiry desk, so a question about an unexpected test result can be discussed with someone who has run the same test.

What support covers

  • Pre-purchase technical advice — instrument selection, test voltage, standards interpretation.
  • Commissioning assistance — remote help during a test window, including configuration and connection questions.
  • Result review — sending us a test file for a second opinion before a decision is made on site.
  • Software and firmware — configuration, updates and reinstalling on a replacement laptop.
  • Fault diagnosis — a written diagnostic before any chargeable repair.

Getting a fast answer

Include the instrument model and serial number, the software version, what you expected and what you measured. A screenshot or the exported test file resolves most questions in one exchange. For urgent problems during an outage, state the deadline in the subject line; arrangements outside business hours can be made for the duration of a commissioning.

Documents such as manuals and firmware are supplied on request — see Downloads. Regional partners and service routing are described on Global presence, and the team structure on Our team.

What warranty does VA-TEK offer on its instruments?

All VA-TEK instruments carry a standard 24-month warranty from the date of shipment, covering defects in materials and workmanship under normal use. The warranty applies to the instrument itself; consumables, and damage caused by misuse, unauthorised modification or operation outside the published environmental limits, are normally excluded. The exact scope is stated in the sales contract, which prevails if it differs.

What the warranty does not cover in practice

  • Wear items — test leads, connectors, fuses and probes are consumables and are supplied as spare parts rather than replaced under warranty.
  • Damage in transit — covered instead by the shipping insurance arranged with the freight, which is why the shipment terms matter at quotation stage.
  • Calibration drift — an instrument that is out of tolerance is recalibrated, not warranted; recalibration is a scheduled service, not a defect.

If something fails

Send the model, serial number and a description of the fault to info@fesotest.com. You receive a diagnostic report and a quotation before any chargeable work is started, so a warranty repair is confirmed as such before the instrument is opened. Repairs are carried out at our Shenzhen facility and the unit returns with an as-found / as-left record and a fresh calibration certificate.

Extended warranty and annual recalibration contracts are available for fleets; ask for them with the original order so the service history starts from commissioning rather than from the first failure. Compliance and calibration documentation is described on Quality certifications.

What industries does VA-TEK serve?

Our customers are the organisations that have to prove electrical equipment is safe to energise or fit to stay in service. The main markets are:

Market What they typically buy
Transmission and distribution utilities Relay test sets, CT/PT analyzers, transformer instruments for commissioning and periodic maintenance
Power generation companies Generator and transformer protection testing, winding resistance, SFRA
Renewable energy developers and EPCs Interconnection and anti-islanding testing, VLF testing of collector cables
Oil, gas and petrochemical plants Motor and feeder protection testing, transformer diagnostics in hazardous areas
Mining, steel and heavy manufacturing Portable test sets for remote sites, harmonic-restrained protection, load shedding verification
Rail and infrastructure operators Traction and substation protection testing
Testing and commissioning service companies Multi-crew instrument fleets, rental during peak seasons
Technical universities and training centres Training-grade relay, CT/PT and VLF instruments for laboratory work

The common thread is not the industry but the requirement: test evidence that survives scrutiny by a client, a regulator or an insurer. That shapes what we supply — calibrated instruments, documented procedures and reports that can be signed and handed over.

Application pages by sector: data centers, industrial plants, renewable energy, panel builders. For project-based work, see substation commissioning and transformer diagnostics.

Where is VA-TEK based?

VA-TEK is based in Shenzhen, Guangdong, China, where Shenzhen Feso Automation Technology Co., Ltd. (FESO) operates its design, manufacturing and calibration facility. The address is Building A3, Fuhai Industrial Park, Fuyong Street, Bao'an District, Shenzhen 518103.

The practical consequences of that location for a buyer outside China:

  • Everything happens on one site — PCB assembly, instrument integration, calibration against traceable standards, burn-in and final acceptance. There is no outsourced contract manufacturer between the design and the shipment.
  • Service routes back to the same place. Repair, recalibration, spares and firmware updates are handled by the facility that built the unit, which is why the serial number is the key piece of information when you contact us.
  • Time zone is GMT+8. Business hours are 09:00–18:00 Monday to Friday. For European and American customers the working-day overlap is short, so written correspondence with an agreed call time is usually more efficient than calling first.

Sales outside China are handled directly and through appointed distributors, depending on the country. If you need the partner or engineer covering your region, send us your location and we will name the contact rather than leave you to guess.

Details of the facility, quality system and company history are on About VA-TEK, Manufacturing and Global presence.

What is included with a VA-TEK relay test set?

A relay test set ships as a complete working package, not just the instrument. The standard shipment contains:

  • The instrument unit, with the channel configuration ordered.
  • Current and voltage test leads in the required length and termination, plus the auxiliary cabling for binary inputs and outputs.
  • Mains power cable with the plug type for the destination country.
  • USB or network communication cable for the test PC.
  • VA-TEK Test Manager software licence and installer, with the test module library.
  • Printed operating manual and a documented test-connection scheme.
  • Factory calibration certificate with traceable results for the unit's serial number.
  • Transit case rated for air freight.

Options that are specified rather than assumed: lead length and termination types, additional current channels, external amplifier or booster, ruggedised transport case, second-language manual, and on-site operator training. Lead set selection is worth deciding early — a set that is right for a panel-mounted relay is wrong for a CT at the top of a switchgear cubicle.

Consumables such as fuses and spare leads are available as spares, and the accessory list per model can be requested with the quotation. Details of the instruments are on the VAE-660 and VAE-430 pages; document requests are handled through Downloads.

Didn't Find Your Answer?