CT Saturation Testing: Knee Point, Excitation Curve and Relay Stability
How to test CT saturation: measure the excitation curve and knee point, calculate the available secondary voltage, and confirm the relay remains stable for a close-in fault.
Application engineers at VA-TEK.
How to test CT saturation: measure the excitation curve and knee point, calculate the available secondary voltage, and confirm the relay remains stable for a close-in fault.
A newly installed 11 kV feeder passed its VLF withstand test, was energised, and failed inside a week. The post-mortem found a void in the first joint, a few millimetres across, sitting quietly at a stress the withstand test never asked it to survive. The withstand test was not wrong. It was asked the wrong […]
Two assets return a tan delta of 0.42%. On a 20-year-old oil-impregnated cable that is a passing result and a reason to schedule the next test. On a brand-new resin-cast transformer bushing it is a reason to stop and open the unit. Same number, opposite conclusions — and that single fact explains why so much […]
A busbar charging test procedure: energize the busbar with no load, verify 87B stability, check the CT circuits and check zone, and prove the trip matrix.
On 1 October 2026, ESCO Technologies completed the acquisition of Megger Group for roughly US$2.35 billion — about 14 times projected EBITDA, with the seller taking a fifth of the buyer in shares. Megger becomes part of ESCO’s Utility Solutions Group alongside Doble. Read that as a signal about where the money in cable testing […]
A 49 thermal overload test procedure: cold and hot curves, thermal memory, the time constant, cooling, pickup, and the alarm and trip outputs.
A 46 negative sequence test procedure: how to create 3I2 with one current, verify the pickup and inverse curve, and test the alarm and trip outputs for motor protection.
A 78 out-of-step test procedure: how to distinguish a stable from an unstable swing, set the trip angle, verify the separation logic, and prove the trip output.
How to test a 68 power swing blocking element: the slow impedance locus, inner and outer blinders, blocking timer, and the unblock decision for a stable or unstable swing.
A 51N/51G test procedure: residual versus core-balance connection, pickup, curve and time multiplier, high-set element, and coordination with the upstream relay.